Your system was sized for the house you had when it went in. Since then the bill has grown, and maybe a battery or an electric car is on the list. More panels sounds like the simple fix. Whether upgrading solar panels is that simple depends on four things: what the old inverter can take, whether new panels match the old ones, what the network will approve, and what the change does to your rebate and feed-in tariff.
Deionno Electrical & Solar has been in business for more than ten years, with our own licensed electricians on every roof in Adelaide and on the Sunshine Coast, and 4.9 stars on Google from more than 530 reviews. Below are the rules that decide each route, and when to leave a good system alone.
Book the free on-site assessment. You get the route that fits your system and the reason for it, in writing.
Three homes it fits, and one that should leave things as they are.
Swipe to see more
Yes. There are four ways to do it, and a fifth option that costs nothing.
The last is the right answer more often than a solar company will tell you. The federal government’s solar guide gives a panel 20 to 30 years and a string inverter 10 to 15, and says it is rare to need to replace a whole system at once [1]. If yours works and the bill is under control, keep it.
Two things decide whether extra panels can go on the inverter you own.
Room on the inverter. Every inverter has a maker’s limit on the panels it can carry and a fixed number of inputs. The common 6.6 kW system on a 5 kW inverter was built to the limit of its day, so it usually has nothing spare.
A match for the old panels. Panels wired together on one inverter input should have similar electrical ratings [2], and the model on your roof is often no longer made. At Hillbank the old panels were 260 watts each. Their replacements were 440.
The way around it is a spare input, where a string of new panels runs on its own. Without one, it’s the next route or a new inverter, a decision our solar inverter repairs and replacement page covers.

When the old system is sound but full, a second one goes beside it: new panels on their own inverter, or each on its own microinverter. The old wiring stays as it is, nothing has to match, and the new system carries its own warranties. The federal scheme treats it as an additional system, so the new panels earn the rebate [3].
It needs roof the first system isn’t using. And in South Australia the export limit covers the whole site, not each system [4]. Our reading: the second system’s value is mostly the power your house uses, not extra exports.
One faulty panel can be replaced by itself. The guidance Australia’s electrical regulators wrote together treats that as a repair, even with a higher wattage panel, as long as its electrical ratings are similar to the one it replaces [2]. A fault is a repair visit: the phone diagnosis is free and a callout fee is credited against the work. See solar system repair or solar fault finding.
A full solar panel replacement is a bigger call. At Hillbank the existing 4.6 kW system was decommissioned and removed, and ten new panels went onto the tile roof in place of the twelve old ones, chosen to match the old system’s output.
Keep the old inverter and change only the panels, and the new panels earn no federal rebate [3].
Storm, hail, fire or lightning damage. Call your insurer first. The claim runs through them, not through us.

Starting again makes sense in three cases.
Not every old panel has to go. Sound panels can be reused on a new inverter, depending on their age. At Fulham the existing panels were restrung into a new 10 kW Sigenergy three phase inverter, with 28 new panels and three batteries added. We recommend what is best for you over the long term.
At Maroochydore the old system was removed and 21 LONGi panels on an 8 kW Sungrow inverter took its place.
Brands we install include AIKO, LONGi, TW Solar and SAJ. See brands we install, and the home solar installer page for sizing.

This is the part most guides skip. Under the regulators’ guidance, adding panels to an existing array is an alteration, not a repair. The electrician has to assess what is already there and certify the result [2]. On the old array that means checking, and fixing where needed:
Where the rebate is claimed, the Clean Energy Regulator requires the installer to re-certify the entire system and upgrade any part that no longer meets requirements [3].
The guidance predates the current solar standard, so treat the list as a guide. What your array needs is settled on the roof by a licensed solar electrician. That work is why a second system, or a fresh start, can work out cheaper than extending an old one.

The federal rebate is paid in certificates, which the installer claims and takes off your price. The Clean Energy Regulator’s rule depends on what changes [3]:
| What changes | Rebate? |
|---|---|
| Panels added to the existing inverter | Yes, on the added panels, if the inverter has the capacity and every component meets current standards |
| New inverter and new panels, with the old panels connected to it | Yes, on the new panels only |
| A separate second system | Yes |
| Whole system replaced | Yes, when the panels and inverter are new and never claimed on |
| Panels replaced, inverter kept | No |
On the last row the regulator is blunt: “This system update is not eligible for STCs.” One panel or all of them, it makes no difference.
New parts must be on the approved products list and never claimed on before, so second-hand panels earn nothing. Our solar rebate calculator works out the certificates for new panels at your postcode.
Adding panels, adding a system or replacing one needs the network’s approval first. We lodge the application in both states.
If you are still paid 44 cents a kilowatt hour for exports, check before you change anything.
Both schemes end in mid-2028: 30 June in South Australia, 1 July in Queensland [8][10]. If the tariff is worth more to you than a bigger system would be, the honest advice may be to wait.
We take them away and recycle them, at no fee.
The federal guidance is that panels are removed by a licensed electrician, never by the owner, and that most of their materials can be recycled [1]. At Beulah Park the old system came off the roof and was safely disposed of, and 15 new panels went on, each with its own microinverter.

There is no honest per-panel price for this work, so we don’t publish one. The price depends on:
Every system is designed from your bills, not a package off a price list. At the free on-site assessment a solar specialist, not a salesperson, reads a year of your bills, checks the panels, inverter, roof and switchboard, and tells you which route fits. About an hour, no travel charge, and a written quote with no extras on install day. Book one, or call 1800 610 165.
Our Adelaide crews work from Salisbury Plain. See the Adelaide solar installer page.
On the Coast our electricians work from Corbould Park. See the Sunshine Coast solar installer page or the solar installation overview.
28 new Jinko panels added to the existing ones, which were restrung into a new 10 kW Sigenergy three phase inverter with three batteries and house backup.
Outcome: The existing panels stayed in service, restrung into a new 10 kW three phase inverter alongside 28 new panels, three batteries and house backup.
Read the full projectFrom the on-site assessment to the certificate.
Swipe to see more
Straight answers from our electricians. Can’t find yours? Call 1800 610 165 or book the assessment and ask on the day.
Yes, four ways: add panels, add a second system, replace the panels or replace the lot. The inverter, the panel match, the network and your feed-in tariff decide which fits. Our free on-site assessment settles it.
Yes. Replacing a faulty panel counts as a repair, as long as the new panel’s electrical ratings are similar to the old one. That is a repair visit: the phone diagnosis is free and a callout fee is credited against the work.
It is when the inverter has room, your bills show you would use the power and no feed-in tariff is at risk. When the inverter is near the end of its life, or the old array needs a lot of work, a second system or a replacement is often the better spend.
Only if they share an inverter input. Panels on one input should have similar electrical ratings, and the old model is often no longer made. A spare input, with the new panels as their own string, gets around it.
On a 44 cent tariff, it depends on the state. In Queensland you keep it if the panels stay within the size of your inverter and you check with your distributor first. In South Australia any alteration is a risk, so ask SA Power Networks before anything changes. Both tariffs end in mid-2028.
Yes on panels added to an inverter with the capacity, on new panels with a new inverter, on a second system and on a full replacement. No on new panels that replace old ones on the same inverter.
We take them away and recycle them at no fee. Sound panels can sometimes stay in service on a new inverter, depending on their age.
Book a free 60-minute on-site assessment with one of our licensed electricians.
Free 60-minute on-site solar and battery assessment. No obligation.
$0 power bill guarantee
If you are considering solar for a new home, or on behalf of someone else, select "I own my home"
A solar or battery system is a permanent change to the property, so it needs to be arranged by the person who owns the home.
If you tapped that by mistake, head back and we'll pick up where you left off.
Our team can talk you through all options if you're not sure.
You'll get all of these. We'd just like to know what matters most.
The average Adelaide home spends $500 - $1000 per quarter. Not sure of yours? Take your best guess, we'll go through the real numbers at your assessment.
Whatever it is today, our goal is $0. If we don't get you there, we'll pay your bill.
We can work with you on a longer timeline, or get you saving as soon as possible.
We have hundreds of happy customers across South Australia. We need your address to check we service your area and to look at your roof before we visit.
Great news, we service your area!
Every system we design is tailored to the home, so the more info the better! (Optional)
Last step. We'll call to arrange your free on-site assessment at a time that suits you. No pressure and no obligation.
Request sent, we'll be in touch!
Call to speak directly with a solar specialist during business hours, and we can get your free on-site assessment booked in straight away.
📞If you haven't called already, we'll give you a call to say hello.
We'll chat about what you're looking for, how we can help, and book in a time for your on-site assessment that suits you.
We visit your home for 45 to 60 minutes to measure up the roof, check the switchboard and review how you use power.
A tailored proposal with the system design, the savings and the pricing laid out in full.
If you're happy with the proposal, our in-house team installs it and shows you how it all works.