Servicing all of South Australia & Queensland Open: 8:00 am to 5:00 pm
Servicing all of South Australia & Queensland Open 8:00 am to 5:00 pm Servicing all of South Australia & Queensland

9.98 kW Off-Grid Solar and 22.4 kWh Battery System in Barossa Goldfields, SA

A 9.975 kW off-grid system of 21 LONGi panels, a 10 kW Sungrow inverter and a 22.4 kWh Sungrow battery, replacing the existing solar system.

Barossa Goldfields, SAOff-grid9.975 kW22.4 kWhCompleted September 2026
9.98 kW Off-Grid Solar and 22.4 kWh Battery System in Barossa Goldfields, SA

The project at a glance

Completed
September 2026
Type
Off-grid
Solar
9.975 kW
Inverter
Sungrow Residential SH10RS, 10 kW
Battery
22.4 kWh
Brands
Sungrow, LONGi

About this solar installation in Barossa Goldfields

This Barossa Goldfields property is off-grid. The existing solar system was decommissioned and removed, and we put in a 9.975 kW array of 21 LONGi Hi-MO X10 Explorer LR7-54HVH-475M panels at 475 W, a 10 kW Sungrow Residential SH10RS inverter and a 22.4 kWh Sungrow SBR224 battery.

Clenergy racking was fitted to suit the roof, and the job included a battery balance of system kit with the consumables for a battery install, plus a 4G dongle for monitoring. Battery work was recorded as a tradesman and an apprentice, eight hours each.

The inverter is wall-mounted above the white stacked battery in a small room, with an AC isolator box beside them. The panels are on a roof next to a metal shed roof.

Through the day the panels carry the loads, and the battery runs the property through the evening and overnight. We are a certified Sungrow installer.

What we installed

  • Solar panels21 x LONGi Hi-MO X10 Explorer LR7-54HVH-475M, 475 W
  • InverterSungrow Residential SH10RS, 10 kW
  • BatterySungrow SBR224, 22.4 kWh (22.4 kWh usable)
  • Battery kitBattery balance of system material kit with install consumables
  • Monitoring4G dongle
  • Existing systemDecommissioned and removed

Free 60-minute on-site assessment

A licensed electrician measures your roof and your bill. No phone quotes.

More solar projects like this in South Australia

Off-grid work across South Australia.

All projects

Swipe to see more

Ready to start?

Book a free 60-minute on-site assessment with one of our licensed electricians.

Free 60-minute on-site solar and battery assessment. No obligation.

4.9Google · 530+ reviews 4.8SolarQuotes reviews