14.73 kW Solar and 40 kWh Battery Installation in Albert Park, SA

31 Jinko panels on four roof faces, a 10 kW GoodWe inverter and five GoodWe battery modules beside a side wall.

Albert Park, SAResidential14.73 kW40 kWhCompleted June 2026
14.73 kW Solar and 40 kWh Battery Installation in Albert Park, SA

The project at a glance

Completed
June 2026
Type
Residential
Solar
14.73 kW
Inverter
GoodWe ESA GW9.999K-EHA-G20, 10 kW
Battery
40 kWh
Roof
tin
Brands
GoodWe, LONGi

About this solar installation in Albert Park

This Albert Park job sits on a grey Colorbond roof beside neighbouring brick units. The panels are 31 Jinko Tiger Neo III JKM475N-48QL6-DV panels at 475 W each, 14.73 kW, on Clenergy racking, facing west, east, south-east and north. With them go a GoodWe ESA GW9.999K-EHA-G20 inverter rated at 10 kW and five GoodWe GW8.3-BAT-D-G20 battery modules, which is 8 kWh usable each and 40 kWh usable in all.

The battery is a tall white tower on a gravel pad against a weatherboard side wall, beside an air conditioner. Its position was set closer to the switchboard after the site visit.

What we installed

  • Solar panels31 x Jinko Tiger Neo III JKM475N-48QL6-DV, 475 W
  • InverterGoodWe ESA GW9.999K-EHA-G20, 10 kW
  • Battery5 x GoodWe GW8.3-BAT-D-G20, 40 kWh usable
  • RackingClenergy racking to suit the roof

Free 60-minute on-site assessment

A licensed electrician measures your roof and your bill. No phone quotes.

More solar projects like this in South Australia

Residential work across South Australia.

All projects

Swipe to see more

Ready to start?

Book a free 60-minute on-site assessment with one of our licensed electricians.

Free 60-minute on-site solar and battery assessment. No obligation.

4.9Google · 530+ reviews 4.8SolarQuotes reviews