Servicing all of South Australia & Queensland Open: 8:00 am to 5:00 pm
Servicing all of South Australia & Queensland Open 8:00 am to 5:00 pm Servicing all of South Australia & Queensland

11.4 kW Solar and 24 kWh GoodWe Battery Installation in Kippa-Ring, QLD

24 Jinko panels on a tile roof, a 10 kW GoodWe inverter and three GoodWe batteries, with the board upgraded for lights and power backup.

Kippa-Ring, QLDResidential11.4 kW24 kWhCompleted May 2026
11.4 kW Solar and 24 kWh GoodWe Battery Installation in Kippa-Ring, QLD

The project at a glance

Completed
May 2026
Type
Residential
Solar
11.4 kW
Inverter
GoodWe ESA GW9.999K-EHA-G20, 10 kW
Battery
24 kWh
Backup
Lights and power
Roof
Tile
Brands
GoodWe

About this solar installation in Kippa-Ring

Backup for the circuits that matter most was the request at this Kippa-Ring home, so the switchboard was upgraded to allow for lights and power backup. Four circuits were changed over to RCBOs, and lights and power stay on through an outage.

The solar is 24 Jinko Solar Tiger Neo panels at 475 W, 11.4 kW in total, along one face of a grey painted concrete-tile roof. A 10 kW GoodWe ESA GW9.999K-EHA-G20 inverter runs the system. That board work is what makes the backup possible.

Three GoodWe GW8.3-BAT-D-G20 batteries take the surplus, 24.96 kWh in all and 24 kWh usable. They sit on a concrete pad or tiles.

What we installed

  • Solar panels24 x Jinko Solar Tiger Neo JKM475N-60HL4R-V 475 W
  • InverterGoodWe ESA GW9.999K-EHA-G20, 10 kW
  • Battery3 x GoodWe GW8.3-BAT-D-G20, 24.96 kWh (24 kWh usable)
  • BackupBoard upgrade for lights and power backup, 4 circuits changed over to RCBOs
  • Battery baseConcrete pad or tiles

Free 60-minute on-site assessment

A licensed electrician measures your roof and your bill. No phone quotes.

More solar projects like this in Queensland

Residential work across Queensland.

All projects

Swipe to see more

Ready to start?

Book a free 60-minute on-site assessment with one of our licensed electricians.

Free 60-minute on-site solar and battery assessment. No obligation.

4.9Google · 530+ reviews 4.8SolarQuotes reviews