11.52 kW Solar and 24.18 kWh Battery Installation in Maroochy River, QLD

An 11.52 kW AIKO solar array with a single phase Sigenergy inverter, three batteries in a shed and five backup circuits upgraded, with a 66 m cable run.

Maroochy River, QLDResidential11.52 kW24.18 kWhCompleted June 2026
11.52 kW Solar and 24.18 kWh Battery Installation in Maroochy River, QLD

The project at a glance

Completed
June 2026
Type
Residential
Solar
11.52 kW
Inverter
Sigenergy SigenStor EC 10.0
Battery
24.18 kWh
Backup
House backup
Brands
Sigenergy

About this solar installation in Maroochy River

The gateway and the inverter position on this Maroochy River property are a long way apart. To manage voltage drop we ran 66 m of 16 mm four core and earth cable between them, using underground conduit and roof conduit.

It is a single phase system with house backup, including backup circuits in a shed. Five circuits were upgraded for backup, so those circuits stay live through an outage. The array is 24 AIKO Solar Neostar panels at 480 W each, 11.52 kW in total, with a Sigenergy SigenStor EC 10.0 single phase inverter and a Sigenergy gateway.

Three Sigenergy SigenStor BAT 8.0 batteries hold 24.18 kWh. The battery stands on a floor mat in the corrugated iron shed, and the inverter is on an external brick wall with a tidy open distribution board.

What we installed

  • Solar panels24 x AIKO Solar Neostar 480 W, 11.52 kW
  • InverterSigenergy SigenStor EC 10.0, single phase
  • Battery3 x Sigenergy SigenStor BAT 8.0, 24.18 kWh
  • BackupSigenergy gateway, single phase house backup
  • Cable66 m of 16 mm four core and earth, gateway to inverter position
  • Switchboard5 circuits upgraded for backup

Free 60-minute on-site assessment

A licensed electrician measures your roof and your bill. No phone quotes.

More solar projects like this in Queensland

Residential work across Queensland.

All projects

Swipe to see more

Ready to start?

Book a free 60-minute on-site assessment with one of our licensed electricians.

Free 60-minute on-site solar and battery assessment. No obligation.

4.9Google · 530+ reviews 4.8SolarQuotes reviews