The Challenges
Engineering Constraints
Positioned near the coast, this project had its fair share of environmental challenges. From wind factors to salt corrosion, we needed an engineering plan that was far from ordinary.
Material Handling
Already an operating business, Wohlers Furniture was welcoming customers daily. So, the challenge was to go about our installation without disrupting their business operations. A bit like fixing the plane while it's flying, if you will.
Speciality Metering
When it came to integrating Tesla batteries, we faced another hurdle. Custom metering systems had to be designed and imported, adding a twist to an already intricate project.